Waagner-Biro Panel Bridge in Gomi - Fast, Heavy-Duty Access for Quarry Operations
Facts and Figures:
Place/Country: Mtkvari River, Gomi, Georgia
Completion: 2023-2024
Project type: Panel (Bailey-type) Bridge
Client: JM Company
Description:
Gomi Quarry, Georgia – Waagner-Biro Panel Bridge Across the Mtkvari River: Keeping quarry operations moving with a rapidly installed heavy-duty bridge.
When a quarry operation near Gomi, Georgia, needed a reliable crossing over the Mtkvari River, time was critical. Extracted bulk material had to be transported from one side of the river to the other, requiring a bridge solution capable of carrying heavy construction vehicles while being installed quickly.
Waagner-Biro Bridge Systems supplied a 33.5 m single-span panel bridge for the Gomi Quarry Project on behalf of Black Sea Group LLC. With a 3.15 m carriageway width and a load capacity designed for 50-tonne vehicles, the bridge provides a robust connection for heavy-duty quarry operations. The bridge was supplied together with standard steel deck elements featuring a raised-pattern surface.
Fast installation with minimal equipment
One of the key advantages of the project was the speed of installation. The complete bridge was assembled in just three days. Once assembled, the 33.5 m span was lifted into its final position using a mobile crane.
A practical solution for quarry and mining applications
The Gomi Quarry project demonstrates the versatility of the Waagner-Biro panel bridge system for quarries, open-pit mines and other heavy-duty industrial applications.
Where haul roads, access routes or natural obstacles such as rivers need to be crossed, a modular panel bridge can provide a robust and rapidly deployable connection without the need for extensive permanent infrastructure.
For the Gomi Quarry, the Waagner-Biro panel bridge enabled construction and quarry vehicles to cross the Mtkvari River safely and efficiently, helping to maintain the flow of bulk material between the two sides of the site.
With its modular design, high load capacity and rapid installation, the Waagner-Biro panel bridge provides an efficient solution wherever heavy vehicles need to maintain access in demanding quarry and mining environments.