Waagner Biro Bridge Systems
WB Bridge Systems WB Indonesia WB Bridge Gulf WB Bridge Qatar
WB Bridge SystemsWB IndonesiaWB Bridge GulfWB Bridge Qatar
Waagner Biro Bridge Systems
Aignersteg Vienna
Aignersteg Vienna

In 1995, Waagner-Biro dismantled the Aigner pedestrian bridge, displaced it as a whole and reinstalled it at its new location near the Danube River in Vienna..

Read More
ReferenceGuenter PrinesdomFebruary 17, 2020Engineered Bridge, Pedestrian Bridge, WBBS AG
Access Bridge and Craneway Freudenau
Access Bridge and Craneway Freudenau

In 1998, Waagner-Biro built an access and arch bridge for the river power station Freudenau in Vienna.

Read More
ReferenceGuenter PrinesdomFebruary 5, 2020Engineered Bridge, Arch Bridge, WBBS AG
Panel Bridge Klosterneuburg
Panel Bridge Klosterneuburg

The Waagner Biro Panel Bridge was erected in 2003 within 4 days by the Austrian Armed Forces across abranch of the river Danube at Klosterneuburg employing a launching nose.

Read More
ReferencePaul AmmerJanuary 4, 2020Panel (Bailey) Bridge, WBBS AG
Newer
Waagner-Biro Bridge Systems GmbH
25 Wipplingerstraße,
Wien, Wien, 1010,
Austria
00431288440 bridge@waagnerbiro-bridgesystems.com
Hours
Mon 8am - 5pm
Tue 8am - 5pm
Wed 8am - 5pm
Thu 8am - 5pm
Fri 8am - 1pm
ImprintPrivacy

(c) Waagner-Biro Bridge Systems AG 2025