In 1995, Waagner-Biro dismantled the Aigner pedestrian bridge, displaced it as a whole and reinstalled it at its new location near the Danube River in Vienna..
Read MoreIn 1998, Waagner-Biro built an access and arch bridge for the river power station Freudenau in Vienna.
Read MoreThe Waagner Biro Panel Bridge was erected in 2003 within 4 days by the Austrian Armed Forces across abranch of the river Danube at Klosterneuburg employing a launching nose.
Read More 
          
        
       
           
          