Posts tagged Temporary Bridge
Waagner-Biro Panel Bridge in Troyes, France – A temporary crossing for a new beginning

Waagner-Biro Panel Bridge in Troyes, France - A temporary crossing for a new beginning: In 2024, Waagner-Biro supplied a 27.43 m Bailey-type panel bridge in Troyes, France, as a temporary replacement for the historic Croncels bridge during its reconstruction. The bridge included a 1.5 m cantilever footwalk and provision for cable services, and was lifted into position by two cranes without launching equipment.

Read More
Waagner-Biro Panel Bridge in Götzis-Koblach, Austria – Safe Access over the motorway A14 during construction works

Temporary bridge for pedestrians and cyclists in Götzis, Austria: Waagner-Biro supplied a 42.7 m long panel bridge for pedestrians and cyclists across the A14 motorway in Götzis-Koblach, Austria. The pre-assembled temporary bridge was lifted into position using two telescopic cranes during an overnight motorway closure, ensuring safe access throughout the rehabilitation of the existing overpass.

Read More