The bridge across the Sierning Brook was a temporary construction site bridge designed for Eurocode. It was installed for a few months in 2017 while replacement works were undergoing for an old road bridge.
Read MoreThe 900-metre Calaba Bridge in the Philippines is currently the longest Modular Steel Bridge ever constructed by Waagner-Biro.
Read MoreThe bridge across the Danube River with a total length of 644m was built by a group of companies led by Waagner Biro and opened to traffic in 1982.
Read MoreThe Tshopo River Bridge is a new 163-metre panel bridge supplied by Waagner-Biro and provides increased capacity and improved safety for road vehicles and pedestrians alike.
Read MoreThe new Botlek Vertical Lift Bridge (Botlekbrug) bristles with superlatives – it has the heaviest weight, the greatest lift frequency and the highest lift speed of any vertical lift bridge.
Read MoreIn 2003, Waagner-Biro built a 42m long replacement bridge for road traffic as per Austrian Standard ÖNORM 4002 (bridge class I) and two footbridges crossing the A7 motorway with a total length of 61m each.
Read MoreIn 1973, Waagner-Biro constructed an 800-metre steel composite bridge over the Lieser Valley. It is located on one of the busiest motorways in Austria, on the Tauern highway.
Read MoreIn 1995, Waagner-Biro dismantled the Aigner pedestrian bridge, displaced it as a whole and reinstalled it at its new location near the Danube River in Vienna..
Read MoreIn 1998, Waagner-Biro built an access and arch bridge for the river power station Freudenau in Vienna.
Read MoreThe Waagner Biro Panel Bridge was erected in 2003 within 4 days by the Austrian Armed Forces across abranch of the river Danube at Klosterneuburg employing a launching nose.
Read More